With the increasing application of battery monitoring systems in various industries such as finance and data centers, the number of construction teams installing batteries and battery monitoring systems in the industry has gradually increased. The connector spacer is not installed correctly, resulting in bad results such as spacer deformation and large error in test data.
PART-01
Spacer selection
Spacers of M6, M8, and M10 are available in three specifications. If the spacer is too large, it may cause the risk of poor contact. If the spacer is too small, it cannot be installed.
Most batteries within GM12-200 (12V200Ah) can use M8 spacer. As shown in the figure below, the diameter of the 12V battery bolt is M8, and M8 spacer can be selected accordingly.
Below we take reference from Fiamm battery.

PART-02
Irregular spacer installation
As shown in the figure below, it will cause deformation of the battery monitoring spacer

As shown in the figure below, it will cause the test internal resistance to be too large.

PART-03
The correct way to install the spacer √

In order to ensure the accuracy of the measurement data, it is necessary to pay attention to the placement of the spacer next to the nut, the spring washer and the spacer of the battery monitoring system, and install and use it correctly to save your construction time.

At GEM Battery, we not only take care of your batteries, but also take of your battery accessories, to make sure your power system with the batteries are working well.
Powered & Powerful!
Distributors and OEM business are warmly welcome.
Get connected with professional lead acid Battery manufacturer,
sales@gembattery.com
WhatsApp: +8615959276199